Skip to content

Shopping Mall Mechanical Installation

HVAC and plumbing design for a 45,000 m² enclosed area.

As part of Shopping Mall Mechanical Installation, we support you at every stage of your project. This text is a placeholder and can be edited from the CMS panel.

Scope

  • Preliminary feasibility and needs analysis
  • Detailed design and calculations
  • Technical control during construction
  • Post-handover support

Process

Starting with an initial consultation, the process continues through needs analysis, design and implementation. Regular progress reports are provided at every stage.

Quality starts with sound planning from day one.

For more information, please reach us through our contact page.

Project gallery

  • Project gallery 1
  • Project gallery 2
  • Project gallery 3